Horse Lake First Nation WTPM2 Engineering assisted Horse Lake First Nation with full engineering services for a new water treatment plant.Click here to READ MORE…

Horse Lake First Nation WTP

M2 Engineering assisted Horse Lake First Nation with full engineering services for a new water treatment plant.

Click here to READ MORE…

Smoky River Raw Water IntakeThe SRRWMC raw water intake had been exposed to severe flooding events that lead to the deterioration of the structure..Click here to READ MORE…

Smoky River Raw Water Intake

The SRRWMC raw water intake had been exposed to severe flooding events that lead to the deterioration of the structure..

Click here to READ MORE…

Village of Nampa Potable Water ReservoirM2 Engineering assessed potable water storage requirements and prepared detailed design for a new reservoir.Click here to READ MORE…

Village of Nampa Potable Water Reservoir

M2 Engineering assessed potable water storage requirements and prepared detailed design for a new reservoir.

Click here to READ MORE…

 
Garden Meadows Reservoir RepairsThe Garden Meadows Reservoir is critical drinking water infrastructure for the City of Wetaskiwin and was showing signs of significant structural integrity failure.Click here to READ MORE…

Garden Meadows Reservoir Repairs

The Garden Meadows Reservoir is critical drinking water infrastructure for the City of Wetaskiwin and was showing signs of significant structural integrity failure.

Click here to READ MORE…

Joussard Water Treatment PlantWith the increase in development, the community has experienced an increase in water demands which put stress on the existing water treatment infrastructure.Click here to READ MORE…

Joussard Water Treatment Plant

With the increase in development, the community has experienced an increase in water demands which put stress on the existing water treatment infrastructure.

Click here to READ MORE…

Fawcett RO Membrane IntegrationM2 Engineering developed a plan to overcome disinfection process challenges that were caused by naturally occurring ammonia in the source water. Our services included piloting a Reverse Osmosis (RO) pilot plant to redu…

Fawcett RO Membrane Integration

M2 Engineering developed a plan to overcome disinfection process challenges that were caused by naturally occurring ammonia in the source water. Our services included piloting a Reverse Osmosis (RO) pilot plant to reduce ammonia levels and improve disinfection.

Click here to READ MORE…

 
Kinuso Reservoir and Pump StationThe existing Kinuso reservoir and pump station had surpassed its life expectancy and was in need of a replacement.Click here to READ MORE…

Kinuso Reservoir and Pump Station

The existing Kinuso reservoir and pump station had surpassed its life expectancy and was in need of a replacement.

Click here to READ MORE…

Dease River First Nation Water & Wastewater Feasibility StudyM2 Engineering’s Feasibility Study assessed existing systems, developed upgrade/retrofit options, and provided recommendations to establish a foundation for future design phases.Click …

Dease River First Nation
Water & Wastewater Feasibility Study

M2 Engineering’s Feasibility Study assessed existing systems, developed upgrade/retrofit options, and provided recommendations to establish a foundation for future design phases.

Click here to READ MORE…

Pickardville Pumphouse UpgradesM2 Engineering evaluated the upgrade needs of the facility, prepared detailed design drawings and provided construction support services.Click here to READ MORE…

Pickardville Pumphouse Upgrades

M2 Engineering evaluated the upgrade needs of the facility, prepared detailed design drawings and provided construction support services.

Click here to READ MORE…

 
City of Wetaskiwin Wastewater Lagoon Action PlanM2 Engineering developed an immediate action plan to assist the City with ongoing wastewater effluent quality issues.Click here to READ MORE…

City of Wetaskiwin
Wastewater Lagoon Action Plan

M2 Engineering developed an immediate action plan to assist the City with ongoing wastewater effluent quality issues.

Click here to READ MORE…

City of Wetaskiwin  Wastewater Feasibility StudyM2 Engineering assessed the City’s existing wastewater systems and provided upgrade options for a new wastewater treatment facility.Click here to READ MORE…

City of Wetaskiwin
Wastewater Feasibility Study

M2 Engineering assessed the City’s existing wastewater systems and provided upgrade options for a new wastewater treatment facility.

Click here to READ MORE…

Town of High River  Lift Station No. 1 UpgradesM2 Engineering supplemented McElhanney’s project team for the pre-design, detailed design and major equipment procurement of the screening and conveyance components of the lift station upgrade project.Click here to READ MORE…

Town of High River
Lift Station No. 1 Upgrades

M2 Engineering supplemented McElhanney’s project team for the pre-design, detailed design and major equipment procurement of the screening and conveyance components of the lift station upgrade project.

Click here to READ MORE…

 
NEW water Limited Regional Water StudyNEW water Limited’s Regional Water System is complex. The Regional Water Study assisted in understanding the future needs of both current and future planned users to help plan upgrade of the existing regional wa…

NEW water Limited Regional Water Study

NEW water Limited’s Regional Water System is complex. The Regional Water Study assisted in understanding the future needs of both current and future planned users to help plan upgrade of the existing regional water treatment plant.

M.D. of Opportunity Water & Wastewater Inventory AssessmentThe Inventory Assessment Project collected data on over 40 water and wastewater assets to help centralize information and aid in future planning.

M.D. of Opportunity Water & Wastewater Inventory Assessment

The Inventory Assessment Project collected data on over 40 water and wastewater assets to help centralize information and aid in future planning.

Town of Peace River Drinking Water Safety Plan AssistanceM2 Engineering assisted the Town with the development of their first Drinking Water Safety Plan.

Town of Peace River
Drinking Water Safety Plan Assistance

M2 Engineering assisted the Town with the development of their first Drinking Water Safety Plan.